Chevron Skirt and Pink Tank Top
ITEM # 3153868P66
Print Description
Crafting Time
Varies
Skill Level
Intermediate
DESCRIPTION +

CHEVRON SKIRT

SUPPLIES & TOOLS:

  • Purl Essence Sincerely (6oz / 170g /295m / 322 yds)
    • Light Grey – 1 (1, 1, 1, 2, 2, 2) balls (A)
    • Black – 1 (1, 1, 1, 2, 2, 2) balls (B)
    • White – 1 ball, all sizes (C)
  • Straight needles US Size 8 (5 mm) or size needed to obtain gauge
  • One - 26 (27-1/2, 31, 35, 39, 43, 46)” 2” width of elastic fabric
  • Sewing needle & thread
  • Tapestry needle
  • Scissors
  • Tape measure

FINISHED MEASUREMENTS
Hip: 35-3/4 (38-1/2, 41-1/4, 44, 46-3/4, 55, 57-3/4”)
Waist: 26 (27-1/2, 31, 35, 39, 43, 46)”
Length: 18” (Note: length is easily adjustable)

GAUGE:

17 sts x 22 rows = 4” in St st
1 rep in Chevron = 2-3/4”
Save time, check the gauge.

DIRECTIONS:

Chevron Stitch (multiples of 13 sts)
Row 1 (RS): * Ssk, k4, m1, k1, m1, k4, k2tog; rep from * to end.
Row 2: Purl.
Rep rows 1-2 for patt.

Stripe Sequence
* 4 rows A, 2 rows C, 4 rows B, 2 rows C; rep from * to end

With A, cast on 171 (184, 197, 210, 213, 236, 249) sts. Work 4 rows even in Garter st. Next row (RS): K1, work row 1 of chevron stitch to last st, end k1. Work even in patt and stripe sequence until piece measures 15”, or approximately 3” shorter than total desired length. Dec row (RS): With A, knit, dec 61 (68, 65, 62, 57, 54, 53) sts evenly around – 110 (116, 132, 148, 166, 182, 196) sts rem. Work even in St st until piece measures 16”, ending after a WS row.

Band
Next row (RS): With C, knit. Purl 1 WS row. Rep these 2 rows until band measures 2”, ending after a RS row. Next row (WS): Knit. Cont in St st for 2 rows. Bind off all sts loosely.

FINISHING:

Sew side seam and weave in ends. Insert elastic fabric into band, fold band, and whipstitch band to inside of skirt. Wash skirt and block to finished measurements.

PINK CANDY TANK

SUPPLIES & TOOLS:

  • Purl Essence Sincerely (6oz / 170g /295m / 322 yds)
    • Magenta – 2 (2, 2, 3, 3, 3, 4) balls
  • US Size 8 (5 mm) straight needles or size needed to obtain gauge
  • Tapestry needle
  • Tape measure
  • Scissors

FINISHED MEASUREMENTS
Bust: 34 (38, 42, 46, 48, 54, 58)”
Length: 21 (22, 22-1/2, 23½, 24, 24-3/4, 25)”

GAUGE:

17 sts x 22 rows = 4” in St st
Save time, check gauge.

BACK
Cast on 72 (80, 90, 98, 106, 114, 124) sts. Knit 1 row (WS). Work even in Garter st for 4 more rows. Next row (WS): Purl. Work even in St st until piece measures 14 (14-1/2, 14-1/2, 15, 15, 15-1/2, 15-1/2)”, ending after a WS row.

Shape Armholes
At beg of next 2 rows, bind off 4 (6, 8, 8, 8, 10, 12) sts. Dec row (RS): K1, k2togtbl, knit to last 3 sts, end k2tog, k1 – 2 sts dec’d. Purl 1 WS row. Rep these 2 rows. 5 (6, 7, 9, 9, 9, 9) more times – 54 (56, 60, 66, 72, 76, 82) sts rem. Work even in St st until armhole measures 7 (7-1/2, 8, 8-1/2, 9, 9-1/4, 9-1/2)”, ending after a WS row. Bind off all sts.

FRONT
Work as for Back until armhole measures 4 (4-1/2, 5, 5-1/2, 6, 6-1/4, 6-1/2)”, ending after a WS row.

Shape Neck
Next row (RS): K18 (19, 21, 23, 26, 28, 30) sts, join new ball of yarn and bind off 18 (18, 18, 20, 20, 20, 22) sts, knit to end. Shape Right Neck: Purl 1 WS row. Dec row (RS): K1, k2togtbl, knit to end – 1 st dec’d. Purl 1 WS row. Rep these 2 rows, 4 (5, 5, 5, 6, 6, 6,) more times – 13 (13, 15, 17, 19, 21, 23) sts rem. Work even in St st until armhole measures 7 (7-1/2, 8, 8-1/2, 9, 9-1/4, 9-1/2)”, ending after a WS row. Bind off all sts. Shape Left Neck: Work as for Right Neck, rev all shaping.

FINISHING:

Sew shoulder and side seams.

Armhole Edging
With RS facing, beg at side seam pick up and knit 58 (62, 66, 70, 74, 76, 78) sts evenly around. Knit 3 rows. Bind off all sts loosely. Rep for opposite armhole. Sew seam along underarm.

Weave in all ends and block lightly to finished measurements.

BRACELET IN CHEVRONS

SUPPLIES & TOOLS:

  • Purl Essence Sincerely (100% acrylic; 6oz / 170g /295m / 322 yds)
  • Light Grey – 1 ball (A)
  • Magenta – 1 ball (B)
  • US Size 6 (4 mm) straight needles or size needed to obtain gauge
  • 3 – 1/4” snaps
  • Sewing needle and thread
  • Tapestry needle
  • Tape measure
  • Scissors

FINISHED MEASUREMENTS
Circumference: 7-1/2 (8, 8-1/2, 9)”
Width: 3”

GAUGE:

19 sts x 28 rows = 4” in St st
Save time, check gauge.

Bracelet
With A, cast on 36 (38, 40, 42) sts. Knit 2 rows. With B, knit 2 rows. With A, knit 1 row. Purl 1 row (WS). Work even in St st until piece measures 1-1/2”, ending after a WS row. Next row (RS): With B, knit 2 rows. With A, knit 2 rows. Bind off all sts.

FINISHING:

Weave in ends. Sew snaps to outside edges of bracelet. Using duplicate stitch and B, embroider chevrons on bracelet, if desired.

SHIPPING & RETURNS +

SHIPPING

Standard Delivery

You can usually expect delivery within 6-10 business days from your order date (business days are Monday-Friday, excluding Holidays).  You’ll receive an email with tracking information when your order is shipped.   Please allow up to 5 business days to receive your tracking information.  

Some items sent directly from our suppliers may take longer, and will ship separate from the remainder of your order. 

Please note that Singer sewing machines cannot be shipped to Guam, Puerto Rico or the U.S. Virgin Islands or to military bases overseas.

Expedited Delivery

Most items will give you the option to upgrade your shipping method for faster delivery.  If you choose to upgrade your shipping method, your order must be received by 11:00 AM ET or your order may not be processed until the following business day. 

For more details & pricing.  See our Full Shipping Policy >


HASSLE-FREE RETURNS

Creativity shouldn’t be complicated, so you can return items for FREE any time to our stores for a hassle-free refund with a smile. Personalized Fabric and Custom Headboards purchased online cannot be returned. You can also return online items by mail.  See Full Return Policy for Details> 

REVIEWS +

CHEVRON SKIRT

SUPPLIES & TOOLS:

  • Purl Essence Sincerely (6oz / 170g /295m / 322 yds)
    • Light Grey – 1 (1, 1, 1, 2, 2, 2) balls (A)
    • Black – 1 (1, 1, 1, 2, 2, 2) balls (B)
    • White – 1 ball, all sizes (C)
  • Straight needles US Size 8 (5 mm) or size needed to obtain gauge
  • One - 26 (27-1/2, 31, 35, 39, 43, 46)” 2” width of elastic fabric
  • Sewing needle & thread
  • Tapestry needle
  • Scissors
  • Tape measure

FINISHED MEASUREMENTS
Hip: 35-3/4 (38-1/2, 41-1/4, 44, 46-3/4, 55, 57-3/4”)
Waist: 26 (27-1/2, 31, 35, 39, 43, 46)”
Length: 18” (Note: length is easily adjustable)

GAUGE:

17 sts x 22 rows = 4” in St st
1 rep in Chevron = 2-3/4”
Save time, check the gauge.

DIRECTIONS:

Chevron Stitch (multiples of 13 sts)
Row 1 (RS): * Ssk, k4, m1, k1, m1, k4, k2tog; rep from * to end.
Row 2: Purl.
Rep rows 1-2 for patt.

Stripe Sequence
* 4 rows A, 2 rows C, 4 rows B, 2 rows C; rep from * to end

With A, cast on 171 (184, 197, 210, 213, 236, 249) sts. Work 4 rows even in Garter st. Next row (RS): K1, work row 1 of chevron stitch to last st, end k1. Work even in patt and stripe sequence until piece measures 15”, or approximately 3” shorter than total desired length. Dec row (RS): With A, knit, dec 61 (68, 65, 62, 57, 54, 53) sts evenly around – 110 (116, 132, 148, 166, 182, 196) sts rem. Work even in St st until piece measures 16”, ending after a WS row.

Band
Next row (RS): With C, knit. Purl 1 WS row. Rep these 2 rows until band measures 2”, ending after a RS row. Next row (WS): Knit. Cont in St st for 2 rows. Bind off all sts loosely.

FINISHING:

Sew side seam and weave in ends. Insert elastic fabric into band, fold band, and whipstitch band to inside of skirt. Wash skirt and block to finished measurements.

PINK CANDY TANK

SUPPLIES & TOOLS:

  • Purl Essence Sincerely (6oz / 170g /295m / 322 yds)
    • Magenta – 2 (2, 2, 3, 3, 3, 4) balls
  • US Size 8 (5 mm) straight needles or size needed to obtain gauge
  • Tapestry needle
  • Tape measure
  • Scissors

FINISHED MEASUREMENTS
Bust: 34 (38, 42, 46, 48, 54, 58)”
Length: 21 (22, 22-1/2, 23½, 24, 24-3/4, 25)”

GAUGE:

17 sts x 22 rows = 4” in St st
Save time, check gauge.

BACK
Cast on 72 (80, 90, 98, 106, 114, 124) sts. Knit 1 row (WS). Work even in Garter st for 4 more rows. Next row (WS): Purl. Work even in St st until piece measures 14 (14-1/2, 14-1/2, 15, 15, 15-1/2, 15-1/2)”, ending after a WS row.

Shape Armholes
At beg of next 2 rows, bind off 4 (6, 8, 8, 8, 10, 12) sts. Dec row (RS): K1, k2togtbl, knit to last 3 sts, end k2tog, k1 – 2 sts dec’d. Purl 1 WS row. Rep these 2 rows. 5 (6, 7, 9, 9, 9, 9) more times – 54 (56, 60, 66, 72, 76, 82) sts rem. Work even in St st until armhole measures 7 (7-1/2, 8, 8-1/2, 9, 9-1/4, 9-1/2)”, ending after a WS row. Bind off all sts.

FRONT
Work as for Back until armhole measures 4 (4-1/2, 5, 5-1/2, 6, 6-1/4, 6-1/2)”, ending after a WS row.

Shape Neck
Next row (RS): K18 (19, 21, 23, 26, 28, 30) sts, join new ball of yarn and bind off 18 (18, 18, 20, 20, 20, 22) sts, knit to end. Shape Right Neck: Purl 1 WS row. Dec row (RS): K1, k2togtbl, knit to end – 1 st dec’d. Purl 1 WS row. Rep these 2 rows, 4 (5, 5, 5, 6, 6, 6,) more times – 13 (13, 15, 17, 19, 21, 23) sts rem. Work even in St st until armhole measures 7 (7-1/2, 8, 8-1/2, 9, 9-1/4, 9-1/2)”, ending after a WS row. Bind off all sts. Shape Left Neck: Work as for Right Neck, rev all shaping.

FINISHING:

Sew shoulder and side seams.

Armhole Edging
With RS facing, beg at side seam pick up and knit 58 (62, 66, 70, 74, 76, 78) sts evenly around. Knit 3 rows. Bind off all sts loosely. Rep for opposite armhole. Sew seam along underarm.

Weave in all ends and block lightly to finished measurements.

BRACELET IN CHEVRONS

SUPPLIES & TOOLS:

  • Purl Essence Sincerely (100% acrylic; 6oz / 170g /295m / 322 yds)
  • Light Grey – 1 ball (A)
  • Magenta – 1 ball (B)
  • US Size 6 (4 mm) straight needles or size needed to obtain gauge
  • 3 – 1/4” snaps
  • Sewing needle and thread
  • Tapestry needle
  • Tape measure
  • Scissors

FINISHED MEASUREMENTS
Circumference: 7-1/2 (8, 8-1/2, 9)”
Width: 3”

GAUGE:

19 sts x 28 rows = 4” in St st
Save time, check gauge.

Bracelet
With A, cast on 36 (38, 40, 42) sts. Knit 2 rows. With B, knit 2 rows. With A, knit 1 row. Purl 1 row (WS). Work even in St st until piece measures 1-1/2”, ending after a WS row. Next row (RS): With B, knit 2 rows. With A, knit 2 rows. Bind off all sts.

FINISHING:

Weave in ends. Sew snaps to outside edges of bracelet. Using duplicate stitch and B, embroider chevrons on bracelet, if desired.