Images

Mens Cable Scarf
Reset

Mens Cable Scarf

Crafting Time:
  • Varies
Skill Level:
  • Intermediate
Project Courtesy of: Caron
Print Project Description Add to Project List

Additional Information

Description

SUPPLIES & TOOLS:

  • Caron® United® (4 oz/113 g; 235 yds/215 m)
    • Soft Grey Heather 3 skeins
  • Size U.S. 8 (5 mm) knitting needles or size needed to obtain gauge
  • Cable needle

MEASUREMENTS:

Approx 8" x 70" [20.5 x 178 cm].

GAUGE:

17 sts and 23 rows = 4" [10 cm] in stocking st.

DIRECTIONS:

Cable Panel A (worked over 8 sts).
1st row: C8F.
2nd and alt rows: P8.
3rd, 5th and 7th rows: K8.
8th row: P8.
These 8 rows form Cable Panel A.

Cable Panel B (worked over 32 sts).
1st row: K2. P2. (C4B. P6) twice. C4B. P2. K2.
2nd and alt rows: Knit all knit sts and purl all purl sts as they appear.
3rd row: K2. P2. (K4. P6) twice. K4. P2. K2.
5th row: As 1st row.
7th row: K2. P1. (T3B. T3F. P4) twice. T3B. T3F. P1. K2.
9th row: K2. T3B. P2. T3F. P2. C3B. C3F. P4. T3B. P2. T3F. K2.
11th row: C4B. P4. T3F. C3B. K4. C3F. T3B. P4. C4F.
13th row: K4. P5. C4F. K6. C4F. P5. K4.
15th row: C4B. P4. C3B. C3F. K4. C3B. C3F. P4. C4F.
17th row: K4. P3. C3B. K2. C3F. K2. C3B K2. C3F. P3. K4.
19th row: C4B. P2. C3B. K4. C3F. C3B. K4. C3F. P2. K4.
21st row: K4. P2. K8. C4B. K8. P2. K4.
23rd row: C4B. P2. T3F. K4. C3B. C3F. K4. T3B. P2. C4F.
25th row: K4. P3. T3F. K2. C3B. K2. C3F. K2. T3B. P3. K4.
27th row: C4B. P4. T3F. C3B. K4. C3F. T3B. P4. C4F.
29th row: K4. P5. C4F. K6. C4F. P5. K4.
31st row: C4B. P3. T3B. T3F. K4. T3B. T3F. P4. C4F.
33rd row: K2. T3F. P2. T3B. P2. T3F. K2. T3B. P2. T3F. P2. T3B. K2.
35th row: K2. P1. T3F. T3B. P4. T3F. T3B. P4. T3F. T3B. P1. K2.
36th row: As 2nd row.
These 36 rows form Cable Panel B.

Cable Panel C (Worked over 8 sts).
See chart on page 2.
1st row: C8B.
2nd and alt rows: P8.
3rd, 5th and 7th rows: K8.
8th row: P8.
These 8 rows form Cable Panel C.

Cast on 54 sts.
**1st row: (RS). *K1. P1. Rep from * to end of row.
2nd row: *P1. K1. Rep from * to end of row. Rep last 2 rows 3 times more.**
Beg working Cable Panels:
1st row: (RS). K1. Work 1st row of Cable Panel A. P2. Work 1st row of Cable Panel B. P2. Work 1st row of Cable Panel C. K1.
2nd row: K1. Work 2nd row of Cable Panel C. K2. Work 2nd row of Cable Panel B. K2. Work 2nd row of Cable Panel A. K1.
3rd row: K1. Work 3rd row of Cable Panel A. P2. Work 3rd row of Cable Panel B. P2. Work 3rd row of Cable Panel C. K1.
4th row: K1. Work 4th row of Cable Panel C. K2. Work 4th row of Cable Panel B. K2. Work 4th row of Cable Panel A. K1.
Cable Panels A, B and C are now in position.

Cont in pat until work from beg measures approx 69" [175 cm], ending on 36th row of Cable Panel B. Work from ** to ** as given above.
Cast off.

 

 

ABBREVIATIONS:

Alt = Alternate(ing)
Approx = Approximate(ly)
Beg = Begin(ing)
C3B = Slip next stitch onto cable needle and leave at back of work. K2, then K1 from cable needle.
C3F = Slip next 2 stitches onto cable needle and leave at front of work. K1, then K2 from cable needle.
Cont = Continue(ing)
C4B = Slip next 2 stitches onto cable needle and leave at back of work. K2, then K2 from cable needle.
C4F = Slip next 2 stitches onto cable needle and leave at front of work. K2, then K2 from cable needle.
C8B = Slip next 4 stitches onto cable needle and leave at back of work, k4, then k4 from cable needle.
C8F = Slip next 4 stitches onto cable needle and leave at front of work. K4, then K4 from cable needle.
K = Knit
P = Purl
Rep = Repeat(ing)
RS = Right side
St(s) = Stitch(es)
T3B = Slip next stitch onto cable needle and leave at back of work. K2, then P1 from cable needle.
T3F = Slip next 2 stitches onto cable needle and leave at front of work. P1, then K2 from cable needle.
WS = Wrong side

Reviews
CUSTOMERS ALSO VIEWED