Slippers for Her
ITEM # 1941935P35
Print Description
Crafting Time
Varies
Skill Level
Intermediate
DESCRIPTION +

SUPPLIES & TOOLS:

  • RED HEART® Super Saver®: 1 skein each 400 Grey Heather A, 512 Turqua B, 661 Frosty Green C
  • Knitting Needles: US 9
  • Stitch markers
  • Yarn needle

DIRECTIONS:

GAUGE: 15 sts = 4" 24 rows = 4" in Stockinette Stitch. CHECK YOUR GAUGE. Use any size needles to obtain the gauge .

Directions are for Size Small; changes for size Medium and Large are in parenthesis

Finished Size: 4" deep X 9 (10,11)" long

Special Stitches
SSK= Slip,Slip, Knit-
Slip next 2 stitches, knitwise, to right needle, insert point of left needle through the front of stitches, knit these stitches together through the back loop (1 stitch decrease).
PSSO= Pass Slipped Stitch Over- Insert the left needle into the front of the slipped stitch, passing it over the previously worked stitch and off the needle.

SLIPPER (make 2):
With A, cast on 41 (47, 55) sts.
Row 1 (Right side): Knit across,
Rows 2 and 3: Knit across.
Row 4: Knit 20 (23, 27), place marker, Knit 1, place marker, knit across.
Row 5: Knit across to marker, slip marker, Yo, K1, slip marker, knit across: 43 (49, 57) sts.
Row 6 AND ALL WRONG SIDE ROWS: Purl across, slipping markers.
Row 7: Knit across to marker, slip marker, Yo, K3, Yo, slip marker, knit across : 45 (51, 50) sts.
Row 9: Knit across to marker, slip marker, Yo, K5, Yo, slip marker, knit across: 47 (53, 61) sts.
Row 11: Knit across to marker, slip marker, Yo, K7, Yo, slip marker, knit across: 49 (55, 63) sts.
Row 13: Knit across to marker, slip marker, Yo, K9, Yo, slip marker, knit across: 51 (57, 65) sts.
Rows 15-23: Knit across, dropping markers, and keeping all wrong side rows in purl.
Bind off all sts in knit, leaving a long end for sewing.

FLOWER (make 6): With B, cast on 15 sts.
Row 1 (Right side): Knit across.
Rows 2 and 3: Knit across.
Bind off all sts in knit, leaving a long end for sewing.

LEAVES (make 2):
With C, cast on 3 sts.
Row 1(right side): Knit across.
Row 2: (K1, Yo) twice, K1: 5 sts.
Row 3 AND ALL RIGHT SIDE ROWS: Knit across.
Row 4: K2, Yo, K1, Yo, K2; 7 sts.
Row 6: K3,Yo, K1,Yo, K3: 9 sts.
Row 8: SSK,K5, K2 tog,: 7 sts.
Row 10: SSK, K3, K2 tog: 5 sts.
Row 12: SSK, K1, K2 tog: 3 sts.
Row 14: Slip 1 as if to knit, K2tog, PSSO: 1 st.
Fasten off, leaving a long end for sewing.

FINISHING
Thread a yarn needle with the Slipper’s long end. Folding slipper in half, with right sides together and matching stitches, sew back and bottom seam.
Thread a yarn needle with the Leaf’s long end. Using photo as a guide sew Leaf to Slipper as desired.
Thread a yarn needle with the Flower’s long end. Wind Flower up and fasten securely, forming a curled bud. Using photo as a guide Sew Flowers to Slipper as desired.


ABBREVIATIONS
K =
knit: mm= millimeter; P = purl; ; st(s) = stitch(es);tog=together; Yo= yarn over; ( ) = work directions in parenthesis as indicated.

SHIPPING & RETURNS +

SHIPPING

Standard Delivery

You can usually expect delivery within 6-10 business days from your order date (business days are Monday-Friday, excluding Holidays).  You’ll receive an email with tracking information when your order is shipped.   Please allow up to 5 business days to receive your tracking information.  

Some items sent directly from our suppliers may take longer, and will ship separate from the remainder of your order. 

Please note that Singer sewing machines cannot be shipped to Guam, Puerto Rico or the U.S. Virgin Islands or to military bases overseas.

Expedited Delivery

Most items will give you the option to upgrade your shipping method for faster delivery.  If you choose to upgrade your shipping method, your order must be received by 11:00 AM ET or your order may not be processed until the following business day. 

For more details & pricing.  See our Full Shipping Policy >


HASSLE-FREE RETURNS

Creativity shouldn’t be complicated, so you can return items for FREE any time to our stores for a hassle-free refund with a smile. Personalized Fabric and Custom Headboards purchased online cannot be returned. You can also return online items by mail.  See Full Return Policy for Details> 

REVIEWS +

SUPPLIES & TOOLS:

  • RED HEART® Super Saver®: 1 skein each 400 Grey Heather A, 512 Turqua B, 661 Frosty Green C
  • Knitting Needles: US 9
  • Stitch markers
  • Yarn needle

DIRECTIONS:

GAUGE: 15 sts = 4" 24 rows = 4" in Stockinette Stitch. CHECK YOUR GAUGE. Use any size needles to obtain the gauge .

Directions are for Size Small; changes for size Medium and Large are in parenthesis

Finished Size: 4" deep X 9 (10,11)" long

Special Stitches
SSK= Slip,Slip, Knit-
Slip next 2 stitches, knitwise, to right needle, insert point of left needle through the front of stitches, knit these stitches together through the back loop (1 stitch decrease).
PSSO= Pass Slipped Stitch Over- Insert the left needle into the front of the slipped stitch, passing it over the previously worked stitch and off the needle.

SLIPPER (make 2):
With A, cast on 41 (47, 55) sts.
Row 1 (Right side): Knit across,
Rows 2 and 3: Knit across.
Row 4: Knit 20 (23, 27), place marker, Knit 1, place marker, knit across.
Row 5: Knit across to marker, slip marker, Yo, K1, slip marker, knit across: 43 (49, 57) sts.
Row 6 AND ALL WRONG SIDE ROWS: Purl across, slipping markers.
Row 7: Knit across to marker, slip marker, Yo, K3, Yo, slip marker, knit across : 45 (51, 50) sts.
Row 9: Knit across to marker, slip marker, Yo, K5, Yo, slip marker, knit across: 47 (53, 61) sts.
Row 11: Knit across to marker, slip marker, Yo, K7, Yo, slip marker, knit across: 49 (55, 63) sts.
Row 13: Knit across to marker, slip marker, Yo, K9, Yo, slip marker, knit across: 51 (57, 65) sts.
Rows 15-23: Knit across, dropping markers, and keeping all wrong side rows in purl.
Bind off all sts in knit, leaving a long end for sewing.

FLOWER (make 6): With B, cast on 15 sts.
Row 1 (Right side): Knit across.
Rows 2 and 3: Knit across.
Bind off all sts in knit, leaving a long end for sewing.

LEAVES (make 2):
With C, cast on 3 sts.
Row 1(right side): Knit across.
Row 2: (K1, Yo) twice, K1: 5 sts.
Row 3 AND ALL RIGHT SIDE ROWS: Knit across.
Row 4: K2, Yo, K1, Yo, K2; 7 sts.
Row 6: K3,Yo, K1,Yo, K3: 9 sts.
Row 8: SSK,K5, K2 tog,: 7 sts.
Row 10: SSK, K3, K2 tog: 5 sts.
Row 12: SSK, K1, K2 tog: 3 sts.
Row 14: Slip 1 as if to knit, K2tog, PSSO: 1 st.
Fasten off, leaving a long end for sewing.

FINISHING
Thread a yarn needle with the Slipper’s long end. Folding slipper in half, with right sides together and matching stitches, sew back and bottom seam.
Thread a yarn needle with the Leaf’s long end. Using photo as a guide sew Leaf to Slipper as desired.
Thread a yarn needle with the Flower’s long end. Wind Flower up and fasten securely, forming a curled bud. Using photo as a guide Sew Flowers to Slipper as desired.


ABBREVIATIONS
K =
knit: mm= millimeter; P = purl; ; st(s) = stitch(es);tog=together; Yo= yarn over; ( ) = work directions in parenthesis as indicated.