Patons Glendon Cable Knit Hat

by Patons |

Item # 042337495P63
Intermediate Varies

SUPPLIES & TOOLS:

  • Patons Classic Wool Worsted Yarn Skein, Brown Mustard (2)
  • Size U.S. 6 (4 mm) Circular Knitting Needle 16" long (or size needed to obtain gauge)
  • Size U.S. 7 (4.5 mm) circular knitting needles 16" long (or size needed to obtain gauge)
  • Set of Size U.S. 7 (4.5 mm) Double-Pointed Knitting Needles (4)
  • Stitch Marker
  • Yarn Needle
  • Cable Needle

  • MEASUREMENTS: One size to fit adult

  • GAUGES: 20 sts and 26 rows = 4" in stocking st with larger needles.

DIRECTIONS:

To find the downloadable patterns click on the "GET PATTERNS" tab above.

With smaller circular needle, cast on 108 sts. Join to work in the rnd, PM on first st.
1st rnd: *K2. P2. Rep from * around. Rep 1st rnd until work from beg measures approx 6" [15 cm].
Inc rnd: With larger circular needle, *K9. M1. Rep from * around. 120 sts.
Beg working in Cable Pat as follows: (see Chart I on page 3)
1st rnd: *P3. C4B. P3. K6. C4B. C4F. K6. Rep from * around.
2nd and alt rnds: *P3. K4. P3. K20. Rep from * around.
3rd rnd: *P3. K4. P3. K4. C4B. K4. C4F. K4. Rep from * around.
5th rnd: *P3. C4B. P3. K2. C4B. K8. C4F. K2. Rep from * around.
7th rnd: *P3. K4. P3. C4B. K12. C4F. Rep from * around.
8th rnd: As 2nd rnd.
Rep 1st to 8th rnds until work from beg measures approx 10" [25.5 cm], ending on an 8th rnd.

SHAPE CROWN
Proceed with Crown Shaping as follows, switching to doublepointed needles when necessary:
1st rnd: *P3. C4B. P3. ssk. K4. C4B. C4F. K4. K2tog. Rep from * around. 112 sts.
2nd rnd: *P3. K4. P3. K18. Rep from * around.
3rd rnd: *P3. K4. P3. ssk. K1. C4B. K4. C4F. K1. K2tog. Rep from * around. 104 sts.
4th rnd: *P3. K4. P3. K16. Rep from * around.
5th rnd: *P1. P2tog. C4B. P2tog. P1. C4B. K8. C4F. Rep from * around. 96 sts.
6th rnd: *P2. K4. P2. ssk. K12. K2tog. Rep from * around. 88 sts.
7th rnd: *P2. K4. P2. K3. C4B. C4F. K3. Rep from * around.
8th rnd: *P2. K4. P2. ssk. K10. K2tog. Rep from * around. 80 sts.
9th rnd: *P2. C4B. P2. C4B. K4. C4F. Rep from * around.
10th rnd: *P2. ssk. K2tog. P2. K12. Rep from * around. 72 sts.
11th rnd: *P2. K2. P2. ssk. C4B. C4F. K2tog. Rep from * around. 64 sts.
12th rnd: *P2. K2. P2. K10. Rep from * around.
13th rnd: *P2. C2B. P2. ssk. C2B. K2. C2F. K2tog. Rep from * around. 56 sts.
14th rnd: *P2tog. K2. P2tog. K8. Rep from * around. 48 sts.
15th rnd: *P1. K2. P1. ssk. K4. K2tog. Rep from * around. 40 sts.
16th rnd: *(P2tog) twice. K6. Rep from * around. 32 sts.
17th rnd: *P2. ssk. K2. K2tog. Rep from * around. 24 sts.
Break yarn, leaving a long end.
Draw end through rem 24 sts tightly and fasten securely.

POM-POM
Wind yarn around 4 fingers approx 70 times. Remove from fingers and tie tightly in center. Cut through each side of loops. Trim to a smooth round shape. Sew pompom to top of Hat. (SEE DIAGRAM 1)


ABBREVIATIONS:
Alt = Alternate(ing)
Approx = Approximately
Beg = Beginning
C2B = Slip next stitch onto cable needle and leave at back of work. K1, then K1 from cable needle
C2F = Slip next stitch onto cable needle and leave at front of work. K1, then K1 from cable needle
C4B = Slip next 2 stitches onto cable needle and leave at back of work. K2, then K2 from cable needle
C4F = Slip next 2 stitches onto cable needle and leave at front of work. K2, then K2 from cable needle
Inc = Increase
K = Knit
K2tog = Knit next 2 stitches together
M1 = Make 1 stitch by picking up horizontal loop lying before next stitch and knitting into back of loop (SEE DIAGRAM 2)
Pat = Pattern
P = Purl
P2tog = Purl next 2 stitches together
PM = Place marker
Rem = Remain(ing)
Rep = Repeat
Rnd(s) = Round(s)
Ssk = Slip next 2 stitches knitwise one at a time. Pass them back onto left-hand needle, then knit through back loops together
St(s) = Stitch(es)

More Project Ideas